Small modular reactors will be financed like infrastructure, not experiments


· 13 min read
This article is part of In conversation about sustainable finance & emission reduction systems, a new series by Diego Balverde. You’re reading volume 33 of the Energy Shocks series. Here is volume 32
Part of Diego Balverde’s upcoming book on how wars, gas, electricity and infrastructure are redrawing the global economy.
The debate over small modular reactors has been dominated for too long by one technical question: whether they can be built safely, repeatedly and competitively. That question remains essential, but it is no longer sufficient. The true inflection point will arrive when SMRs stop being treated as energy prototypes and begin to be structured as replicable industrial infrastructure. As long as every project is considered an exception, every licence an isolated experience, every supply chain a reconstruction from zero and every buyer a special case, capital costs will continue to reflect uncertainty, difficult schedules and first-of-a-kind risk. The promise of modularity becomes economically meaningful only when repetition turns engineering into manufacturing, licensing into reusable processes, suppliers into stable industrial chains and energy contracts into demand sufficient to support a fleet. The market does not need one hundred different concepts. It needs a limited number of designs capable of moving from demonstration into disciplined execution.
The demand forming around this market is also different from the demand that drove the large nuclear plants of the twentieth century. The new buyer may be a utility, but it may also be an artificial-intelligence campus, a remote mine, a petrochemical complex, an industrial port, a hydrogen plant, a region with constrained grid access or a manufacturing cluster requiring firm electricity and heat for decades. Modular scale allows generation and demand to move closer together without forcing every system to absorb several gigawatts at once. It can enable phased deployment, add capacity as load grows and use industrial sites where existing infrastructure reduces part of the development burden. But that advantage exists only when the reactor stops being sold as a technological object and begins to be sold as part of a complete architecture involving energy, grids, water, fuel, storage, security, construction, operations and finance.
The next nuclear battle will not be only between reactor technologies. It will be between execution models. The winners will be those able to reduce uncertainty, repeat components, compress schedules, secure fuel, limit design changes, obtain long-duration buyers and structure portfolios that distribute risk across multiple units. Engineering will remain the heart of the system. Financial discipline will determine whether that heart ever enters commercial operation.
A smaller reactor is not automatically a cheaper reactor. Reduced size can lower project exposure, simplify selected construction processes and allow phased deployment, but it can also sacrifice some economies of scale historically available to large plants. Modular advantage appears when smaller units are combined with standardisation, serial manufacturing and a reduction in site-specific work. The fundamental economic question is not how many megawatts one unit contains, but how many times essentially the same unit can be constructed without redesign.
The aviation industry does not build every aircraft as a unique infrastructure project. Turbine manufacturing, electrical equipment and many industrial assets become competitive through repetition, stable suppliers, controlled quality and cumulative learning. SMRs attempt to transfer part of that logic into an industry historically dominated by large one-off projects. The transition is not trivial because nuclear safety requires exceptionally high standards, complete traceability, specialised materials and rigorous licensing. Precisely for that reason, standardisation matters even more. Every unnecessary modification multiplies engineering, documentation, testing, training and risk.
The first unit will remain the problem. A first-of-a-kind project absorbs design, certification, factory preparation, workforce training, fuel infrastructure and contractor learning. If the market evaluates that first unit as though it permanently represents the cost of the technology, it may prematurely discard designs that could improve through repetition. But the opposite argument is equally dangerous: assuming automatically that every future reactor will become much cheaper without proving orders, suppliers and execution. A learning curve is not a mathematical promise. It has to be built industrially.
Finance must recognise this distinction. An isolated prototype requires capital willing to absorb technology and construction risk. A standardised fleet can progressively approach infrastructure characteristics, with long-term contracts, more predictable debt and refinancing after operation begins. The objective for the sector should be to cross that transition as quickly as possible. As long as early projects continue to be financed as individual adventures, the technology will remain trapped inside a cost of capital incompatible with infrastructure designed to recover investment over decades.
Modularity offers a second advantage: sequencing. A buyer can install one unit, add another as demand increases and progressively share buildings, interconnections, security, personnel and auxiliary systems. A modular nuclear park can grow in a manner similar to selected data-centre campuses or industrial complexes, where trunk infrastructure is installed first and capacity is added in modules. This logic can reduce the risk of building too much capacity before demand exists, particularly in smaller markets or constrained electricity systems.
The economics of a modular project will depend on who buys the electricity and what else that customer requires beyond electricity. Traditional utilities remain natural buyers, but they will not be the only ones. Large digital, industrial and extractive consumers have load profiles that can justify long-term contracts, specific locations and a premium for continuity. The direct relationship between firm generation and firm demand may become one of the principal drivers of the sector.
Data centres are the most visible example because they combine rapid growth, high power density, continuity requirements and the ability to sign long-duration agreements. But the logic extends much further. A chemical plant may need electricity and steam. A refinery may use firm energy, hydrogen and heat. A remote mine can reduce exposure to transported fuel. A desalination plant can convert continuous electricity into storable water. An industrial port can support refrigeration, storage, fuel production and nearby networks. A steel complex can use electricity, heat and hydrogen in different proportions. Modularity enables generation to be designed around these clusters rather than forcing demand to adapt completely to one very large plant.
This integration creates multiple revenue streams. A plant can sell electricity, firm capacity, steam, heat, hydrogen or grid services. Financial value improves when each stream has a buyer and a contract before financial close. A reactor built in the expectation that demand will appear later repeats one of the oldest infrastructure errors. A project constructed around a cluster with firm electrical and thermal contracts reduces revenue uncertainty.
It also changes geography. SMRs may create value in regions where a large-scale plant would be too big for the grid or too difficult to finance. Island systems, isolated industrial zones, mining corridors, weak-grid regions and countries with growing demand but relatively small electricity systems may become relevant markets. This does not mean every territory can host a reactor. Safety, institutions, regulation, workforce, fuel, water and public acceptance remain fundamental. Modular scale expands options; it does not eliminate requirements.
Industrial customers can also help finance complementary infrastructure. If a project includes BESS, substations, electrolysers, desalination, steam networks or data centres, the reactor no longer carries the entire economic structure alone. The complete platform can be organised through different contracts, separate SPVs and capital adapted to each asset. BalGreen can intervene precisely in this peripheral architecture: DOIX.IO can measure demand, hourly load profiles, continuity, water, heat, storage and connection capacity; BalGreen can design the industrial-energy package around the reactor; BalGreen Capital can structure BESS, networks, thermal storage, water assets and other financeable components without pretending to replace the proprietary nuclear engineering of the reactor itself.
Modular nuclear power will only become truly modular if an industry exists that can manufacture repeated units without rebuilding the supplier base for every project. Reactor vessels, pumps, valves, control systems, materials, instrumentation, fuel, electrical equipment, structures, shielding and safety systems require certified manufacturers and tightly controlled processes. A fleet can fail even with a strong design if critical components are concentrated among too few suppliers or production lead times extend for years.
Fuel will be especially sensitive. Different designs may require different enrichment levels, fuel forms or fabrication chains. Markets must distinguish between a reactor that is technically ready and one whose fuel chain can support dozens of units. Nuclear energy security does not begin when the reactor enters service. It begins in uranium mining, conversion, enrichment, fabrication, transport and storage. Countries seeking nuclear expansion will need to decide how much of this chain they want to control, diversify or secure through long-term agreements.
Advanced manufacturing will create another opportunity. Automation, robotic welding, digital inspection, material traceability, simulation, additive manufacturing for approved components and data-driven quality control can reduce time without lowering standards. The objective should not be speed for its own sake, but to convert repetition into reliability. A factory capable of producing identical modules and documenting every stage can reduce variability compared with projects where a large share of engineering is executed physically on site.
Logistics will also be critical. The modular concept often assumes major components can be manufactured centrally and transported to site. That advantage depends on roads, ports, railways, bridges, weight limits and heavy-lift equipment. Industrial ports may become nodes for nuclear manufacturing and assembly because they combine land, maritime access, heavy cargo, industrial capability and electricity connections. A port sector currently thinking mainly about fuels may discover another opportunity as part of the nuclear supply chain.
Workforce capacity will become another bottleneck. A programme containing dozens of units requires operators, welders, engineers, inspectors, digital specialists, protection experts, maintenance professionals and regulatory personnel. Human capacity has to grow before the fleet. BalGreen Academy can contribute in complementary competencies such as BESS, grids, digitalisation, cybersecurity, data analysis, industrial maintenance and energy management around nuclear sites, while nuclear-specific training remains within the appropriate regulatory and authorised frameworks.
Financial cost can determine the success or failure of nuclear power more decisively than small differences in technical efficiency. A project taking too long to build accumulates interest before producing a single MWh. Every regulatory delay, design change or contractual dispute increases final cost and weakens confidence among future investors. Modularity will only change this situation when it reduces the gap between projected schedules and actual schedules.
Fleet financing may provide part of the answer. Instead of treating every unit as a completely independent project, several reactors of the same design can be grouped inside an architecture where learning, suppliers, insurance, contracts and project teams are shared. Early units absorb greater risk; later ones benefit from real construction and operating data. Capital can reprice progressively as uncertainty falls. This is much more convincing than asking investors to believe from the beginning in unproven future costs.
Corporate buyers can provide another layer. Long-duration contracts with data centres, industries or utilities reduce price risk. Governments may intervene through guarantees, contracts for difference, capacity frameworks or first-fleet support where a clear strategic objective exists. But public support should be designed to create a repeatable industry rather than indefinitely sustaining projects unable to reach competitiveness.
Standard Chartered and other project-finance institutions may find opportunities where construction, offtake, fuel and operating risks are properly allocated. Institutional investors such as BlackRock can participate more naturally after the technology approaches mature infrastructure characteristics, with operating assets, long contracts and predictable cash flows. The first unit needs a different form of capital from the tenth reactor. Pretending both should be financed in the same way misunderstands how risk evolves.
DOIX.IO can provide value across complementary assets and the industrial-performance layer by measuring energy availability, BESS utilisation, losses, water, heat, infrastructure and associated demand. BalGreen can design the systems that convert firm generation into additional economic output. The objective is not to replace the nuclear developer, but to prevent a high-availability reactor from being connected to inefficient surrounding infrastructure. Generation can perform exceptionally while the cluster around it wastes part of the value. That gap is exactly where financial and operational integration matters.
The first opportunity lies in standardised fleets. Governments, utilities and major buyers able to commit several units of the same design will create better conditions for suppliers, manufacturers, banks and workforce development. The second lies in existing sites. Locations with connections, water access, personnel, electrical infrastructure and regulatory experience can reduce part of the risk involved in developing entirely new locations. The third appears in artificial-intelligence clusters and data centres, where demand for firm electricity can support sufficiently long contracts to justify capital-intensive assets.
The fourth lies in mining and critical resources. Remote regions with constant demand and expensive transported fuel may value modular reactors once technology and regulation reach sufficient maturity. The fifth concerns industrial heat, steam and desalination. Selling more than one product can improve economics when nearby buyers and real contracts exist. The sixth is manufacturing. Components, materials, valves, pumps, electrical systems, sensors, robotics, software, cybersecurity and quality control represent a market larger than the reactor itself.
The seventh opportunity lies in ports able to host heavy manufacturing, modular assembly and component transport. The eighth appears in BESS associated with nuclear plants, reducing the need to alter reactor output in response to short-duration variation while capturing network services. The ninth lies in water and thermal infrastructure connected to reactors, where complementary assets can be financed separately and reduce concentration of risk.
The tenth is first-fleet finance. Markets able to build instruments that absorb early risk and refinance after operation will create a bridge between development capital and institutional infrastructure investment. The eleventh lies in insurance, completion guarantees and mechanisms aligning contractors with realistic schedules. The twelfth appears in workforce development because a fleet industry requires thousands of professionals and technicians before the reactors enter service.
The debate over SMRs has been too technological for a problem that will ultimately be industrial and financial. The decisive question is not whether a small reactor can produce electricity. The nuclear industry already understands the physics. The real question is whether a country or company can build a sequence of similar units with enough discipline to convert extraordinary project risk into ordinary infrastructure risk. That transition will separate commercially relevant designs from the many proposals that remain in development for years.
Modular advantage must not be confused with miniaturisation either. Smaller size provides deployment flexibility, but the real economics appear in repetition, manufacturing, reusable licensing and learning. If every location introduces major modifications, modularity loses much of its value. If every buyer demands a different configuration, the supply chain never reaches serial production. The future of the sector requires less exceptionalism and more standardisation.
Artificial intelligence, industrial electrification and energy-security demand may create the market that was missing for years because buyers now exist that value firm power over decades and may be constrained by grids unable to deliver new gigawatts quickly enough. That does not guarantee SMR success. It creates an opportunity that will compete against large reactors, gas, renewables plus storage, geothermal, interconnections and other solutions. Modularity will still need to demonstrate a concrete advantage at each site.
The financial interpretation matters even more. A reactor does not become cheap because a vendor publishes a target cost. It becomes financeable when construction, fuel, contracts, insurance and operations reduce uncertainty enough for capital to demand a lower return. The nuclear sector must reduce both perceived risk and real risk. Repetition is the mechanism capable of doing both simultaneously.
The demand now forming creates an extraordinary window for modular nuclear power. Data centres need firm electricity. Industry seeks security. Grids take time to expand. Some countries want lower exposure to imported fuels. Mines, ports and industrial clusters need concentrated and predictable generation. But this demand will not finance experiments indefinitely. It will require schedules, contracts, supply chains and evidence.
The next cycle will rapidly separate two categories. On one side will remain designs dependent on unique projects, constant modification, incomplete supply chains and costs that are difficult to verify. On the other will be platforms capable of constructing the same unit repeatedly, using recurring suppliers, common teams, long-term contracts and progressively lower risk after every project.
That is when the financial nature of the asset will change. The first reactor may look like a technology bet. The fifth will begin to resemble an industrial platform. The tenth may begin to resemble infrastructure.
And when that happens, the true achievement of SMRs will not be that they made the reactor smaller. It will be that they made uncertainty smaller.
illuminem Voices is a democratic space presenting the opinions of leading Sustainability Thought Leaders, their views do not necessarily represent those of illuminem.
The world needs sustainability knowledge. At illuminem, no interest group or shareholder can influence our work. Thank you for supporting our mission to make high-quality and independent sustainability information free for all. Every contribution helps. Thank you for donating today.
Diego Balverde

Nuclear · Energy
Diego Balverde

Nuclear · Sustainable Finance
Diego Balverde

Nuclear · Power & Utilities
Financial Times

Nuclear · Power & Utilities
Green Central Banking

Nuclear · Power & Utilities
Interesting Engineering

Renewables Tech · Nuclear